 **QA4Seas** is a project funded by Copernicus Programmes and operated by ECMWF \\ **QA4Seas** is a project funded by Copernicus Programmes and operated by ECMWF \\
 The project is split into two periods covering the total duration of the contract (M1-M18; M19-M27).\\ The project is split into two periods covering the total duration of the contract (M1-M18; M19-M27).\\
 +
 +BSC is supported by:
 +
 +MeteoSwiss, Switzerland \\
 +Predictia, Spain \\
 +University of Leeds, UK \\
 +University of Exeter, UK \\
 +Instituto de Física de Cantabria - CSIC, Spain \\
  
  ====== Gantt diagram ======  ====== Gantt diagram ======
  
 The activity of the two main phases will be organised around the five work packages, plus one work package dealing with the project management and the communication of the main outcomes (WP0)\\ The activity of the two main phases will be organised around the five work packages, plus one work package dealing with the project management and the communication of the main outcomes (WP0)\\
 +
  
 {{:wiki:gantt_chart_sc2.jpg?direct |Gantt Chart SC2}} {{:wiki:gantt_chart_sc2.jpg?direct |Gantt Chart SC2}}
Line 27: Line 36:
 ===Starting January 1st, 2018 to September, 30th 2018=== ===Starting January 1st, 2018 to September, 30th 2018===
 **Scientific Objectives** Formulation of the requirements, 2nd stage of user's consultation, gap assessment and development of eht EQC framework and the prototype  \\ **Scientific Objectives** Formulation of the requirements, 2nd stage of user's consultation, gap assessment and development of eht EQC framework and the prototype  \\
-**Contractual framework **: covered by Bilateral Collaboration Agreement #2 with each partner \\+**Contractual framework**: covered by Bilateral Collaboration Agreement #2 with each partner \\
  
 ====== QA4Seas Work Packages  ====== ====== QA4Seas Work Packages  ======
Line 46: Line 55:
 ==== General Assembly (Berlin, 24th - 28th of September 2018) ==== ==== General Assembly (Berlin, 24th - 28th of September 2018) ====
  
 +{{ :wiki:c3s_51_lot3_poster_20092018_a0_format.pptx|C3S 51 Lot 3 Poster}}
 ==== Final meeting (Berlin, 24th of September 2018) ==== ==== Final meeting (Berlin, 24th of September 2018) ====