meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
wiki:c3s_51_lot3_contract_overview [2018/10/10 10:21] – dchmiele | wiki:c3s_51_lot3_contract_overview [2018/10/15 13:47] (current) – [General Assembly (Berlin, 24th - 28th of September 2018)] dchmiele | ||
---|---|---|---|
Line 9: | Line 9: | ||
**QA4Seas** is a project funded by Copernicus Programmes and operated by ECMWF \\ | **QA4Seas** is a project funded by Copernicus Programmes and operated by ECMWF \\ | ||
The project is split into two periods covering the total duration of the contract (M1-M18; M19-M27).\\ | The project is split into two periods covering the total duration of the contract (M1-M18; M19-M27).\\ | ||
+ | |||
+ | BSC is supported by: | ||
+ | |||
+ | MeteoSwiss, Switzerland \\ | ||
+ | Predictia, Spain \\ | ||
+ | University of Leeds, UK \\ | ||
+ | University of Exeter, UK \\ | ||
+ | Instituto de Física de Cantabria - CSIC, Spain \\ | ||
| | ||
The activity of the two main phases will be organised around the five work packages, plus one work package dealing with the project management and the communication of the main outcomes (WP0)\\ | The activity of the two main phases will be organised around the five work packages, plus one work package dealing with the project management and the communication of the main outcomes (WP0)\\ | ||
+ | |||
{{: | {{: | ||
Line 46: | Line 55: | ||
==== General Assembly (Berlin, 24th - 28th of September 2018) ==== | ==== General Assembly (Berlin, 24th - 28th of September 2018) ==== | ||
+ | [[https:// | ||
+ | {{ : | ||
==== Final meeting (Berlin, 24th of September 2018) ==== | ==== Final meeting (Berlin, 24th of September 2018) ==== | ||