meta data for this page
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| start [2022/09/06 08:32] – fdoblas | start [2024/10/03 17:06] (current) – pcastell | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Climateurope2 ====== | ====== Climateurope2 ====== | ||
| **Project reference number: 101056933. | **Project reference number: 101056933. | ||
| - | Project start date: 1 September 2022. | + | Start date: 1 September 2022. |
| - | Project duration: 54 months.** | + | Duration: 54 months.** |
| ----------------------------------------------------------------- | ----------------------------------------------------------------- | ||
| Line 21: | Line 21: | ||
| The Climateurope2 high-level objectives in relation to the work packages (WPs) of the project | The Climateurope2 high-level objectives in relation to the work packages (WPs) of the project | ||
| - | **A brief presentation of the project can be consulted {{ : | ||
| Line 27: | Line 26: | ||
| ---------------------------------------------------- | ---------------------------------------------------- | ||
| - | This contract | + | {{ :kom.jpg |}} |
| + | Climateurope2 kick-off meeting, 27th of September 2022, Lecce, Italy | ||
| + | |||
| + | The Climateurope2 consortium is made of 33 parties (29 beneficiaries, | ||