meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2022/09/02 20:13] – fdoblas | start [2022/10/06 14:21] (current) – pcastell | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Climateurope2 ====== | ====== Climateurope2 ====== | ||
- | **Project number: 101056933. | + | **Project |
- | Project starting | + | Start date: 1 September 2022. |
- | Project duration: 54 months.** | + | Duration: 54 months.** |
----------------------------------------------------------------- | ----------------------------------------------------------------- | ||
Line 21: | Line 21: | ||
The Climateurope2 high-level objectives in relation to the work packages (WPs) of the project | The Climateurope2 high-level objectives in relation to the work packages (WPs) of the project | ||
- | **A brief presentation of the project | + | **A brief presentation of the project |
Line 27: | Line 27: | ||
---------------------------------------------------- | ---------------------------------------------------- | ||
- | This contract | + | {{ :kom.jpg |}} |
+ | Climateurope2 kick-off meeting, 27th of September 2022, Lecce, Italy | ||
+ | |||
+ | The Climateurope2 consortium is made of 33 parties (29 beneficiaries, |