meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2022/09/02 20:13] fdoblasstart [2022/10/06 14:21] (current) pcastell
Line 1: Line 1:
 ====== Climateurope2 ====== ====== Climateurope2 ======
-**Project number: 101056933. +**Project reference number: 101056933. 
-Project starting date: fixed date 1 September 2022. +Start date: 1 September 2022. 
-Project duration: 54 months.**+Duration: 54 months.**
 ----------------------------------------------------------------- -----------------------------------------------------------------
  
Line 21: Line 21:
             The Climateurope2 high-level objectives in relation to the work packages (WPs) of the project             The Climateurope2 high-level objectives in relation to the work packages (WPs) of the project
  
-**A brief presentation of the project can be consulted here {{ :climateurope2_intro.pdf|}}**+**A brief presentation of the project is available {{ :wiki:climateurope2_intro-2.pdf |here}}**.
  
  
Line 27: Line 27:
 ---------------------------------------------------- ----------------------------------------------------
  
-This contract involves 31 institutions: the Barcelona Supercomputing Center-Centro Nacional de Supercomputación (**BSC**), Fondazione Centro Euro-Mediterraneosui Cambiamenti Climatici (**CMCC**), Universita Degli Studi di TRENTO (**UNITENTRO**), Koninklijk Nederlands Meteorologish Institut (**KNMI**), Sveriges Meteorologiska Och Hydrologiska Institut (**SMHI**), Mariene Informatie Service Maris BV (**MARIS**), Centre Europeen de Recherche et Deformation Avancee en Calcul Scientifique (**CERFACS**), Republicki Hidrometeoroloski Zavodsrbije (**RHMZ**), Universitaet Bremen (**UBREMEN**), Deutsches Klimarechenzentrum GMBH (**DKRZ**), Helmotz-Zentrum Hereon GMBH (**HEREON**), Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung EV (**Fraunhofer**), Danmarks Tekniske Universitet (**DTU**), Ecologic Institut (**ECO**), LGI Sustainable Innovation (**LGI**), The Climate Data Factory (**TCDF**), World Meteorological Organization (**WMO**), Wyzsza Szkola Bankowa W Poznaniu (**WSB**), Stichting Wageningen Research (**WR**), Stichting Deltares (**Deltares**), Fundación Tecnalia Research and Innovation (**TECNALIA**), Centar Za Promociju Nauke (**CPN**), Technische Universitaet Muenchen (**TUM**), Climate-Kic Holding BV (**CLIMATE-KIC**), Ramboll France SAS (**REH**), Ramboll Management, consulting (**RMC**), Weblyzard Technology GMBH (**WLT**), European Centre for Medium-Range Weather Forecasts (**ECMWF**), Din Deutsches Institut Fuer Normung EV (**DIN**), DNV AS (**DNV**), University of Leeds (**UNIVLEEDS**), Met Office (**MET OFFICE**), and United Kingdom Research and innovation (**UKRI**). The contract is led by the BSC.+{{ :kom.jpg |}} 
 +                  Climateurope2 kick-off meeting, 27th of September 2022, Lecce, Italy 
 + 
 +The Climateurope2 consortium is made of 33 parties (29 beneficiaries, 1 affiliated entity and 3 associated partners) from 13 countries that cover a large spectrum of expertise and capabilities. This project involves 33 institutions: the Barcelona Supercomputing Center-Centro Nacional de Supercomputación (**BSC**), Fondazione Centro Euro-Mediterraneosui Cambiamenti Climatici (**CMCC**), Universita Degli Studi di TRENTO (**UNITENTRO**), Koninklijk Nederlands Meteorologish Institut (**KNMI**), Sveriges Meteorologiska Och Hydrologiska Institut (**SMHI**), Mariene Informatie Service Maris BV (**MARIS**), Centre Europeen de Recherche et Deformation Avancee en Calcul Scientifique (**CERFACS**), Republicki Hidrometeoroloski Zavodsrbije (**RHMZ**), Universitaet Bremen (**UBREMEN**), Deutsches Klimarechenzentrum GMBH (**DKRZ**), Helmotz-Zentrum Hereon GMBH (**HEREON**), Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung EV (**Fraunhofer**), Danmarks Tekniske Universitet (**DTU**), Ecologic Institut (**ECO**), LGI Sustainable Innovation (**LGI**), The Climate Data Factory (**TCDF**), World Meteorological Organization (**WMO**), Wyzsza Szkola Bankowa W Poznaniu (**WSB**), Stichting Wageningen Research (**WR**), Stichting Deltares (**Deltares**), Fundación Tecnalia Research and Innovation (**TECNALIA**), Centar Za Promociju Nauke (**CPN**), Technische Universitaet Muenchen (**TUM**), Climate-Kic Holding BV (**CLIMATE-KIC**), Ramboll France SAS (**REH**), Ramboll Management, consulting (**RMC**), Weblyzard Technology GMBH (**WLT**), European Centre for Medium-Range Weather Forecasts (**ECMWF**), Din Deutsches Institut Fuer Normung EV (**DIN**), DNV AS (**DNV**), University of Leeds (**UNIVLEEDS**), Met Office (**MET OFFICE**), and United Kingdom Research and innovation (**UKRI**). The contract is led by the BSC.