• Morris Jette's avatar
    backfill scheduling enhancement · e62a9270
    Morris Jette authored
    When determining when a pending job will be able to start, rather
      than testing after removing each running job and trying to schedule
      the pending jobs, remove multiple jobs that all end about the
      same time before testing. This reduces the number of calls to
      the job placement logic, which is time consuming.
    e62a9270
To find the state of this project's repository at the time of any of these versions, check out the tags.