-
Morris Jette authored
When determining when a pending job will be able to start, rather than testing after removing each running job and trying to schedule the pending jobs, remove multiple jobs that all end about the same time before testing. This reduces the number of calls to the job placement logic, which is time consuming.
e62a9270
To find the state of this project's repository at the time of any of these versions, check out the tags.