• Morris Jette's avatar
    backfill scheduling with group limits fix · 3ee1632f
    Morris Jette authored
    Backfill scheduling fix: If a job can't be started due to a "group" resource
        limit, rather than reserve resources for it when the next job ends, don't
        reserve any resources for it. The problem with the original logic is that
        if a lot of resources are reserved for such pending jobs, then jobs futher
        down the queue may defered when they really can and should be started. An
        ideal solution would track all of the TRES resources through time as jobs
        start and end, but we don't have that logic in the backfill scheduler and
        don't want that extra overhead in the backfill scheduler.
    bugs 2326 and 2282
    3ee1632f
To find the state of this project's repository at the time of any of these versions, check out the tags.