1. 21 Mar, 2014 1 commit
    • Danny Auble's avatar
      NRT - Fix issue with 1 node jobs. It turns out the network does need to · 440932df
      Danny Auble authored
      be setup for 1 node jobs.  Here are some of the reasons from IBM...
      
      1. PE expects it.
      2. For failover, if there was some challenge or difficulty with the
         shared-memory method of data transfer, the protocol stack might
         want to go through the adapter instead.
      3. For flexibility, the protocol stack might want to be able to transfer
         data using some variable combination of shared memory and adapter-based
         communication, and
      4. Possibly most important, for overall performance, it might be that
         bandwidth or efficiency (BW per CPU cycles) might be better using the
         adapter resources.  (An obvious case is for large messages, it might
         require a lot fewer CPU cycles to program the DMA engines on the
         adapter to move data between tasks, rather than depend on the CPU
         to move the data with loads and stores, or page re-mapping -- and
         a DMA engine might actually move the data more quickly, if it's well
         integrated with the memory system, as it is in the P775 case.)
      440932df
  2. 20 Mar, 2014 2 commits
  3. 19 Mar, 2014 2 commits
  4. 18 Mar, 2014 4 commits
  5. 17 Mar, 2014 1 commit
  6. 15 Mar, 2014 2 commits
  7. 14 Mar, 2014 3 commits
  8. 12 Mar, 2014 1 commit
  9. 11 Mar, 2014 6 commits
  10. 10 Mar, 2014 1 commit
  11. 08 Mar, 2014 2 commits
  12. 07 Mar, 2014 6 commits
  13. 06 Mar, 2014 6 commits
  14. 05 Mar, 2014 1 commit
  15. 04 Mar, 2014 2 commits