- 16 Apr, 2014 3 commits
-
-
Morris Jette authored
squeue %F format will now print the job ID for non-array jobs. bug 716
-
jette authored
Expand StdIn/Out/Err string length output by "scontrol show job" from 128 to 1024 bytes. bug 712
-
David Parks authored
See bug 701
-
- 15 Apr, 2014 14 commits
-
-
Danny Auble authored
salloc/srun, instead wait in the slurmd when a step hits a node and the prolog is still running.
-
Danny Auble authored
-
Morris Jette authored
priority/basic - Insure job priorities continue to decrease when jobs are submitted with the --nice option. bug 707
-
Danny Auble authored
-
David Bigagli authored
-
David Bigagli authored
-
Danny Auble authored
has ran yet or not.
-
Danny Auble authored
Cray/ALPS system, otherwise use the slurmd to wait on the prolog to gate the start of the step.
-
Morris Jette authored
Fix some sinfo and squeue sorting anomalies due to differences in data types. See bug 706
-
Danny Auble authored
-
Danny Auble authored
bluegene.conf
-
Danny Auble authored
-
Danny Auble authored
restarted.
-
Danny Auble authored
allocation instead of just the first.
-
- 14 Apr, 2014 3 commits
-
-
Morris Jette authored
Update scontrol update jobID logic to operate on entire job arrays.
-
Morris Jette authored
Add squeue job format option of "%y" to print a job's nice value. bug 696
-
Morris Jette authored
Move start time of main scheduling loop timeout after locks are aquired. bug 698
-
- 11 Apr, 2014 5 commits
-
-
Morris Jette authored
controls how frequently the main scheduling loop will execute.
-
Morris Jette authored
limits how long the main scheduling loop can execute for
-
Danny Auble authored
-
Franco Broi authored
-
David Bigagli authored
-
- 10 Apr, 2014 4 commits
-
-
David Bigagli authored
not been processed by the scheduler yet.
-
Danny Auble authored
-
Morris Jette authored
Modify srun to report an exit code of zero rather than nine if some tasks exit with a return code of zero and others are killed with SIGKILL. Only an exit code of zero did this.
-
Morris Jette authored
Cache job information and drop out of loop after finding the desired array task. This improves performance a fair bit. bug 684
-
- 09 Apr, 2014 3 commits
-
-
David Bigagli authored
-
Morris Jette authored
Rather than immediately invoking an execution of the scheduling logic on every event type that can enable the execution of a new job, queue its execution. This permits faster execution of some operations, such as modifying large counts of jobs, by executing the scheduling logic less frequently, but still in a timely fashion.
-
Danny Auble authored
If you have multiple partitions the output from sinfo -o "%D %F" would have unexpected results, hardly ever correct.
-
- 08 Apr, 2014 5 commits
-
-
Morris Jette authored
-
Morris Jette authored
Fix logic bugs for SchedulerParameters option of max_rpc_cnt. Scheduling would be delayed for job arrays and backfill scheduling would be disabled unless max_rpc_cnt > 0.
-
Danny Auble authored
-
Danny Auble authored
on Mixed state.
-
David Bigagli authored
-
- 07 Apr, 2014 3 commits
-
-
Danny Auble authored
This changes the behavior of license_update which it's current behavior makes for doubling license counts. This is ok, because the only place it is used expects the counts to be zeroed out afterwards.
-
Morris Jette authored
-
Danny Auble authored
in it. Signed-off-by: Danny Auble <da@schedmd.com>
-